Program health
Program health is calculated on two measures:
The status of the program's requirements
The health of the controls that are linked to the program's requirements
Hyperproof assigns the status of critical if a program has no requirements or controls, if the requirement status is set to not applicable, not started, or in progress, or if the number of controls , where health is critical, is greater than zero.
If the number of controls , where health is at risk, is greater than zero, then Hyperproof assigns the status of at risk.
For the program to be overall healthy, using the default health calculation, all requirements must be completed and all controls must be healthy.
Note
For Hyperproof to calculate the health of your program, you must turn on program health.