Linking a new task to a risk

Roles and permissions

The following roles can link a task to a risk:

  • Anyone with manager or contributor permissions for the risk

Note

Risks cannot be linked to tasks created on a different object, e.g. to a task created on a control.

  1. From the left menu, select Risk.

  2. Select your Risk Register.

  3. Select the Risks tab.

    risks-tab-generic.png
  4. Select the risk that you want to link the task to.

  5. Click the Task icon.

    task-icon-generic.png
  6. Optionally, click the Pin icon to pin the Tasks panel.

    tasks-pin-icon-generic.png
  7. Click New task.

    The Task window opens.

  8. Click Create.

    The task is created.

Linking a Jira issue to a risk

A Jira issue can be linked to a risk via a Hyperproof task.

  1. Create the issue in Jira if it does not already exist.

  2. Link the Jira issue to a Hyperproof task. See Attaching an existing Jira issue to a task

  3. Link the task to a risk. See the steps above